0816-4021402 / 403 , 9449637043, 8867354168 info@cittumkur.org
Select Page

   

OTHERS (BANKING/ATM/MEDICAL FACILITIES)

 

  • The banking facilities is extended from Karnataka Bank Ltd. and State Bank of Mysore to all the students and staff of the institute.
  • The State Bank of Mysore operates an ATM machine on-campus for the benefit of our student and staff.
  • First-aid treatment is readily available on-campus and in all laboratories. Doctors are on-call to attend to any emergencies on an as needed basis.
  • The institute has identified many hospitals for the benefit of staff and students for their periodic health check-ups.
  • The institute has an understanding with Manipal Hospital of Tumkur for providing health services at a discounted price.

WI-FI

 

  • Wi-fi facility is provided for the students to work in their laptops both in campus & hostel for academic purposes.
  • 34-Mbps internet connectivity & wi-fi facility all-over the campus(including boys hostel).

 

   

GYM (Fitness Centre)

 The Gym(Fitness Centre) is well equipped with a range of free weights. The gym is great for building strength, burning fat, improving general fitness, or for specific sports conditioning. The gym is for the students and staffs.

   

Other Facilities

  •  Purified Drinking Water Facility in all the building/Floors
  • Two RO plants are installed in the campus; used for drinking water purpose
  • Rain Water Harvesting system in campus
  • First Aid Facility in all the Labs
  • Barrier Free Environment
  • CCTV surveillance in all the buildings/ Floor
  • Elevator Facility to disabled students
  • Fire extinguisher facility
  • E-waste disposal 
  • Purified Drinking Water Facility in all the building/Floors Two RO plants are installed in the campus; used for drinking water purpose
  • Rain Water Harvesting system in campus
  • First Aid Facility in all the Labs Barrier
  • Free Environment CCTV surveillance in all the buildings/ Floor
  • Elevator Facility to disabled students
  • Fire extinguisher facility E-waste disposal

Time Table Draft Timetable, Dec 2026 – Jan 2027